On Friday, January 27th, the overhead department had a working bee and changed over 5 poles on the Sutherland line. The poles had been placed into position by our specialist pole contractors some time previously.
99u was used to assist this work.
![](/tramway/wp-content/uploads/2017/01/SC-99U-Overhead-Work1a_27-01-17.jpg)
![](/tramway/wp-content/uploads/2017/01/SC-99U-Overhead-Work2a_27-01-17.jpg)
Scott Curnow